Page 20

Frontiers December 2015 - January 2016 Issue

Photos: (Top) Employees stage the first 737 MAX 8 fuselage to switch tracks near the Renton, Wash., factory, where the airplane will be assembled. (Bottom, from left) Overhead crane operators lift the fuselage over to the three-story fuselage systems installation tool; the fuselage is loaded into the fuselage systems installation tool. 20 BOEING FRONTIERS


Frontiers December 2015 - January 2016 Issue
To see the actual publication please follow the link above